Estimate your migration timeline, the time saved versus a consultant-led build, and the recurring cost you avoid by decommissioning your legacy system. Adjust the inputs for an instant estimate.
Illustrative estimate only, based on typical Syntra ETL engagements. Decommissioning savings assume you retire the legacy system after migration. Your actual figures depend on scope — request a fixed-fee quote for exact numbers.
Get your exact fixed-fee quote →The estimate models a Syntra ETL migration using pre-built extractors, FBDI/HDL loaders and an automated reconciliation engine, which removes the multi-month bespoke build that dominates consultant-led projects. Timeline scales with the number of source systems (additional systems run partly in parallel), complexity and history depth.
The 3-year legacy cost avoided is your stated annual run/maintain cost over three years, on the assumption you decommission the legacy system after cutover — recovering license, hosting, support and specialist-staff cost for a system nobody transacts in.